Open Quantum pricing

3 quantum computers

Open Quantum sells runs on IonQ Forte, IonQ Forte Enterprise and AQT IBEX Q1. The rates below are the ones it published, read on 2026-11-04. The same machine can cost a different amount through another marketplace: every published rate is on one page.

What a run costs through Open Quantum

The rates as published

Quantum computersHow it billsPublished rateSource
How it bills
Per task and per shot
Published rate
$0.18 per task + $0.048 per shot
Source
How it bills
Per task and per shot
Published rate
$0.18 per task + $0.0141 per shot
Source

How this was measured

One host, one harness

Every simulator ran the same circuits on one host, single-threaded and core-pinned, driven through one common harness, so any overhead the harness adds is charged to the simulator. Each result was checked against a reference implementation: a simulator that ran fast but returned the wrong answer is left out of the ranking. Nothing is interpolated or rescaled. A time was measured, or it is not shown.

Run 2026-08-10, 8 cores, threads=1. numpy 2.4.6, scipy 1.18.0, torch 2.13.0, numba 0.66.0, pennylane 0.45.1, pennylane_lightning 0.45.0, qiskit 2.5.1, qulacs 0.6.14, tensorcircuit 1.8.0, cudaq 0.15.1. One host and one thread make the comparison reproducible. It is not a prediction for your laptop.

The interactive tool shows the same measurements for any workload you pick, with the quantum hardware that could run it and what a run would cost.

Hardware figures each carry the source they came from and the date they were measured. The oldest in this set is 626 days old. Costs are bands, not quotes.

Host: Linux-6.8.0-1051-aws-x86_64-with-glibc2.35, 8 cores, threads=1, core-pinned. numpy 2.4.6, scipy 1.18.0, torch 2.13.0, numba 0.66.0, pennylane 0.45.1, pennylane_lightning 0.45.0. Every simulator was driven through one common harness, so any harness binding overhead is charged to the simulator rather than hidden.

© 2026 EigenOrbit. All rights reserved.